CASE STUDY
Cold Storage Room
Model farm shop, Bradford
We were asked to carry out ground works so that we could concrete an area in preparation for additional coldstores and prep room. This was completed within 24hrs and is now a perfectly flat, power floated finished floor sealed for added protection and durability.